Resources

posted on: 13-Oct-2015

Topic 1 Smelly Toilets – Why, Where, What, Who, When and How to eliminate   Topic 2 Selecting the TYPE of JOINT for Pressurized Portable Water   [Download PDF]  

posted on: 11-Aug-2015

Module 1A ARCHITECT AND THE SOCIETY PPC-1A-role & responsibilities   Module 2A ARCHITECT AND THE LAW PPC-m2A-2015-r1   Module 3A Architects Rules 1986 (scale of minimum fees) PPC-m3A-scaleofminimumfees-r1   Certificates and Certifications by Architects under the PAM Form of Building Contract 2006 CPD-Certificates_AR_ZULHEMLEE   BUILDING CONTRACT ADMINISTRATION – In reference to PAM Building Contract 2006 […]

posted on: 11-Aug-2015

Please find attached the seminar notes for Designing for Fire Safety Parts 1,2,3 and 4 in .ppsx format Designing for Fire Safety Notes

posted on: 11-Jun-2014

Please refer to the letter from Majlis Bandaraya Miri (MBM) dated 30th May 2014 on the revision of the issuance of occupation permit process within 2 days and new standard operating procedures.   These are effective from the 1st June 2014. MD Miri 06062014

posted on: 28-Apr-2014

Please refer to the attach letter dated 28 April 2014 from the Dewan Bandaraya Kuching Utara for the above mentioned. dbku

1 2 3 4 5 6

Upcoming Events

Advertisement

Nippon DML Print

Gala Dinner 2017

1500560608gd_499 1500560309gd_283 1500560580gd_451 1500560250gd_260 1500559797gd_046 1500560686gd_598 1500559861gd_061 1500559911gd_067 1500560435gd_341 1500559735gd_035