Discussion with Bomba Sarawak on Reviewing of Fire Requirements Section, SBO 1994

Share thisFacebookDiggStumbleUponTwitterPinterestEmail

Date: 14 Aug 2017 (Monday)

Venue: Meeting Room Murai, Level 2, Bomba HQ

Conclusion of Discussion:

  • Isse draft to all relevant NGO – PAM, Bomba, IEM, ACEM, MIP, SHEDA, JKR , LGCD – Bomba to confirm with LGCD on who should be issuing this.
  • 30 working days (45 calendar days) from the date if the letter/correspondence for their feedback/comment. Otherwise deem to be agreed.
  • Claddings for external wall shall be refer detail as a system including inspection.
  • Fire extinguisher for residential building. (non-retrospective) by rating (min. 13A)
  • Provision of Refuge Floor & Evacuation Lift.

IMG_4091 IMG_4089 IMG_4086 FullSizeRender 43

Comments are closed.

News

Share thisFacebookDiggStumbleUponTwitterPinterestEmail

PAMSC CALENDER OF EVENTS YEAR 2013

Upcoming Events

There are no upcoming events at this time.

Advertisement

Print DML

Design Forum 2018

whatsapp-image-2018-06-22-at-2-42-28-pm-4 whatsapp-image-2018-06-22-at-2-42-28-pm-10 whatsapp-image-2018-06-22-at-2-42-28-pm-1 whatsapp-image-2018-06-22-at-2-42-28-pm-12 whatsapp-image-2018-06-22-at-2-42-28-pm-9 whatsapp-image-2018-06-22-at-2-42-28-pm-13 whatsapp-image-2018-06-22-at-2-42-28-pm-8 whatsapp-image-2018-06-22-at-2-42-28-pm-15 whatsapp-image-2018-06-22-at-2-42-28-pm-3 whatsapp-image-2018-06-22-at-2-42-28-pm-6