Discussion with Bomba Sarawak on Reviewing of Fire Requirements Section, SBO 1994

Share thisFacebookDiggStumbleUponTwitterPinterestEmail

Date: 14 Aug 2017 (Monday)

Venue: Meeting Room Murai, Level 2, Bomba HQ

Conclusion of Discussion:

  • Isse draft to all relevant NGO – PAM, Bomba, IEM, ACEM, MIP, SHEDA, JKR , LGCD – Bomba to confirm with LGCD on who should be issuing this.
  • 30 working days (45 calendar days) from the date if the letter/correspondence for their feedback/comment. Otherwise deem to be agreed.
  • Claddings for external wall shall be refer detail as a system including inspection.
  • Fire extinguisher for residential building. (non-retrospective) by rating (min. 13A)
  • Provision of Refuge Floor & Evacuation Lift.

IMG_4091 IMG_4089 IMG_4086 FullSizeRender 43

Comments are closed.

News

Share thisFacebookDiggStumbleUponTwitterPinterestEmail

PAMSC CALENDER OF EVENTS YEAR 2013

Upcoming Events

Advertisement

DML Nippon Print

Gala Dinner 2017

1500559596gd_004 1500560329gd_289 1500560537gd_436 1500560483gd_402 1500560191gd_228 1500560435gd_341 1500560173gd_208 1500560823gd_658 1500559761gd_037 1500560742gd_673